Porr Bau GmbH
Site Manager/Project Manager
Deparment: Concrete and Civil Engineering
From 2022 – U2 underground line – New southbound branch for the U2 underground line – U2|18 – Matzleinsdorfer Platz
2021 – 2022 – New helipad UKH Meidling, Vienna
2019 – 2022 – “Hafentor Albern” includes planning and construction of a closure structure in the form of a port gate, operation building and a pumping station for the port Albern (Danube) in Vienna – Simmering for the purpose of flood protection.
2017 – 2020 – Power Plant Murkraftwerk, Graz – Construction of the new hydroelectric plant in Graz including a 5,0km long Sewage-Concrete-Channel
2014 – 2016 – Südgürtel Graz, Graz – New ring road B67a
2014 – Greenline Metro, Doha
2013 – S2 Highway, Warsaw
2013 – S10 Highway, Freistadt
2011 – 2013 – South Approach Roads, Belgrade
2009 – 6 Months – Traineeship Sava Bridge